Proposed 75 MW Kalkfontein Solar PV Facility and BESS
A 75 MW photovoltaic facility with a battery energy storage system, on-site substation and a 132 kV grid connection.
- Process
- Scoping & EIR (Scoping phase)
- Competent authority
- DFFE
- Reference number
- 14/12/16/3/3/2/0000
- Applicant
- Sample Renewable Energy (Pty) Ltd
- Location
- Free State
- Comment period
- 23 Oct 2026 to 22 Nov 2026
Documents for review
Sample listing for demonstration. Replace these files with the real documents.
How to take part
- Review the documents listed above.
- Send written comments to Ronaldo Greeff-Retief at ronaldoretief@gmail.com before 22 Nov 2026.
- Quote the reference number (14/12/16/3/3/2/0000) in all correspondence. Comments received are included in the report submitted to DFFE.