Proposed 75 MW Kalkfontein Solar PV Facility and BESS

A 75 MW photovoltaic facility with a battery energy storage system, on-site substation and a 132 kV grid connection.

Process
Scoping & EIR (Scoping phase)
Competent authority
DFFE
Reference number
14/12/16/3/3/2/0000
Applicant
Sample Renewable Energy (Pty) Ltd
Location
Free State
Comment period
23 Oct 2026 to 22 Nov 2026

Documents for review

Sample listing for demonstration. Replace these files with the real documents.

  • pdf
    Draft Scoping Report Sample_Draft_Scoping_Report.pdf · 738.0 B
    Download
  • pdf
    Plan of Study for EIA Sample_Plan_of_Study.pdf · 739.0 B
    Download

How to take part

  1. Review the documents listed above.
  2. Send written comments to Ronaldo Greeff-Retief at ronaldoretief@gmail.com before 22 Nov 2026.
  3. Quote the reference number (14/12/16/3/3/2/0000) in all correspondence. Comments received are included in the report submitted to DFFE.