Skip to main content

RGR Environmental Solutions

Services

Specialist studies and environmental approvals

Six core services, all delivered by a registered EAP and natural scientist. Choose a service to see what it covers and where it has been used.

Environmental authorisation, start to finish

Impact Assessments

Most developments that trigger a listed activity under NEMA need environmental authorisation before work can start. We run the full process: confirming which activities apply, appointing and coordinating specialists, running public participation, writing the reports and dealing with the competent authority until a decision is issued.

What's included

  • Screening and legal applicability
  • Basic Assessment process
  • Scoping and EIR process
  • Environmental Management Programmes
  • Amendment applications
  • Section 24G rectification
  • Public participation
  • International ESIAs to IFC standards

Typical deliverables

BARS&EIREMPrS24GPPP reportESIA

Coal-fired power station beyond open grassland

Relevant experience

  • Adams & Pulida PV and BESS facilities
    Northern Cape & Free State · 2022
  • MCWAP-2 power line and substation
    Limpopo · 2022–23
  • Louis Fourie Mixed-Use Development
    Mossel Bay · 2021–22
  • NEOM Community 1 ESIA update
    Saudi Arabia · 2025

Flora, fauna and sensitivity mapping

Ecology & Biodiversity

Ecological findings often decide where a development can go. We survey sites for vegetation types, protected and Red List species and ecological corridors, then map sensitivity so that layouts can avoid the areas that matter before an application is submitted.

What's included

  • Flora and fauna assessments
  • Ecological scans and opinions
  • Site sensitivity verification
  • Species search and rescue
  • Biodiversity Action Plans
  • Monitoring protocols
  • Alien invasive plant management plans
  • Protected tree permit applications

Typical deliverables

Ecological Impact AssessmentSSV reportBAPTree permitAlien eradication plan

Red lilies flowering in dry veld

Relevant experience

  • Sishen Mine Biodiversity Action Plan
    Northern Cape · 2012
  • Timbavati Road diversion and tree permits
    Limpopo · 2020–23
  • Tumair & Majmah solar farms
    Saudi Arabia · 2025
  • Barberton Makhonjwa Mountains World Heritage Site
    Mpumalanga · 2024

Delineation, biomonitoring and licensing

Wetlands & Water

Any activity within 500 m of a wetland, or that changes a watercourse, may need a water use authorisation under the National Water Act. We delineate wetlands, assess their condition and function, monitor river health and prepare the Water Use Licence Application or General Authorisation registration.

What's included

  • Wetland delineation
  • Present Ecological State and functional assessment
  • Aquatic impact assessments
  • SASS5 biomonitoring
  • Water quality monitoring and reporting
  • Water Use Licence Applications
  • General Authorisations
  • Surface water management

Typical deliverables

WULAGA registrationWetland reportSASS5Water quality report

Vegetated wetland and channel on the edge of a town

Relevant experience

  • Majuba Power Station ash dump expansion
    Wetland delineation · 2012
  • Oshoek Land Port of Entry
    WULA · 2019–20
  • Kangra Coal mines
    Wetland assessments · 2023
  • Johannesburg urban rivers
    Biomonitoring · 2008

Plans, licences and landfill studies

Waste Management

Municipalities must prepare Integrated Waste Management Plans, and waste facilities need licences and ongoing compliance. We assess landfill sites, prepare IWMPs and status-quo reports, write waste specialist studies and handle waste licence applications.

What's included

  • Integrated Waste Management Plans
  • Landfill status-quo assessments
  • Waste specialist studies
  • Waste Management Licence applications
  • Industrial symbiosis studies
  • Landfill ecological and wetland inputs

Typical deliverables

IWMPStatus-quo reportWML applicationWaste specialist report

Disturbed red-soil landscape under a cloudy sky

Relevant experience

  • Limpopo municipal IWMPs (11 municipalities)
    LEDET · 2023–24
  • National industrial symbiosis programme
    DFFE · 2023
  • Danielskuil domestic waste site EIA
    Kgatelopele LM · 2011
  • eZulu Game Reserve
    Waste specialist report · 2020–22

Emissions licensing and monitoring

Air Quality

Facilities that carry out listed activities under the Air Quality Act need an Atmospheric Emission Licence and must monitor against its conditions. We prepare licence applications, set up dust and emissions monitoring programmes, and review air quality reports independently.

What's included

  • Atmospheric Emission Licence applications
  • Monitoring programmes based on AEL conditions
  • Dust fallout monitoring and reporting
  • Independent review of air quality reports

Typical deliverables

AEL applicationMonitoring programmeDust fallout reportReport review

Monitoring mast with a solar panel above rocky shrubland

Relevant experience

  • Four correctional facilities
    AEL applications · 2026
  • Maroeloesfontein Mine
    AEL monitoring and audit · 2016–17
  • Shell terminals
    Air quality report review · 2023

ECO services and environmental audits

Compliance & Audits

Once authorisation is granted, its conditions and the approved EMPr have to be followed on site and audited. We act as Environmental Control Officer during construction, carry out compliance and performance audits, and assess management systems against ISO standards.

What's included

  • Environmental Control Officer services
  • Contractor environmental inductions
  • EA and EMPr compliance audits
  • Environmental performance assessments
  • ISO 14001, 9001 and 45001 assessments
  • Mine EMPr performance audits

Typical deliverables

ECO reportsAudit reportInduction trainingISO assessment

Construction site with safety barriers around an excavation

Relevant experience

  • Eskom Kusile
    Environmental performance audit · 2022
  • Kareerand, Harmony Gold
    Performance audit · 2023
  • Tembisa bulk water pipeline
    ECO · 2008
  • Samancor Chrome
    External audit · 2012

Also offered

Supporting specialist services

Visual Impact Assessments

Viewshed analysis in GIS and on-site photography to assess how a development will change the landscape.

GIS Mapping

Sensitivity maps, locality and layout maps for applications, produced in ArcGIS and PlanetGIS.

Petroleum Sites

Groundwater monitoring, gas testing, tank removals and EIAs for filling stations and fuel depots.

Mining Applications

Environmental input to prospecting and mining right applications, and EMPr amendments.

Carbon Footprints

Greenhouse gas footprints for ESG reporting and accreditation, such as Airport Carbon Accreditation.

Guidelines & Training

Plain-language guidelines, posters and training material, such as a national wetland best-practice guideline.

Planning a development? Bring the environmental specialist in early.

Early screening shows which approvals you need and how long they will take, before they hold up construction.

Phone

072 666 6348

Email

ronaldoretief@gmail.com